1P.O. Box 4069 • Winston-Salem, NC 27115 • 336-661-9893 • 336-661-9895 (Fax)UC – 711 E Gravity and PumpSoft Serve Freezer Single Flavor Counter Model
10DO NOT attempt to operate the freezer while low onmix or your freezer may be damaged. It is also possibleto activate a beeper to sound when mix is l
113) Beater Motor Overload Protector - Monitors thecurrent draw of the beater drive motor. If the motordraws excessive amperage, the overload will tri
12Part III–Initial Cleaning Procedure!! IMPORTANT !!Before starting this procedure, place the machine inthe STOP mode on the touch pad.This is a new m
13B) Pump Fed Cleaning ProcedureProceed with the disassembly of the mix injectionpump located in the mix storage tank. First slide theconnecting tub
14C) Disassembling the Dispensing HeadLoosen and remove the two dispensing head-retainingknobs. The knobs are removed by turning counterclockwise unti
15D) Disassembling the Beater / AugerRemove the beater / auger assembly from the cylinderby pulling straight out of the machine towards you.Disassembl
16Part IV - Assembling the FreezerA) Assembling the Beater / AugersAfter completing the Cleaning Operation, you arenow ready re-assemble the freezer.
17B) Assembling the Dispensing HeadLocate the parts that will be needed to assemble thedispensing head. These parts include: A) Dispensinghead oring,
18Spread the lubricant to lightly coat the pistonsurface between and including the orings. Thiswill ensure free movement of the pistons anddispensing
19C) Assembling the Gravity Feed TubeLocate the parts needed to assemble the gravity feedtubes. This should include: A) Splash guard, B) Orings(2per),
20D) Assembling the Mix Injection PumpBefore assembling the mix injection pump, locate all ofthe parts that will be required. (See Below)First install
21Install the pump body assembly into the rear hub insideof each mix storage tank. Slide the drive shaft into therear hub and rotate the pump until th
22Part V - Sanitizing the FreezerPrior to filling the machine with fresh liquid mix, theassembled machine must be sanitized. The frequencyof cleaning
23“Push to Select” button on the front touch pad (#571.2)until the beater mode is selected. Allow the machine torun in the beater mode for approximate
24Part VI – Starting the FreezerOnly after completing the cleaning and sanitizingprocedures should you fill the machine with freshmix. The mix being u
25570571.1571.2B) Pump Fed MachinesWith your clean, sanitized hands, install the feedingelbow into the cylinder feed hole. Next slide the elbowconnect
26Part VII – Operating the FreezerThe machine will automatically stop the freezing processafter achieving the pre-set “consistency” value (numberdispl
27B) Gravity Fed MachinesThe gravity feed tube consists of two tubes, onesliding inside of the other, and a center splash guard.The inner tube blends
28Part VIII – Periodic Cleaning ProceduresCleaning and sanitizing schedules for your freezer aredetermined by your local Health Department and / or
29B) Pump Fed MachinesWith frozen mix in the cylinder, select the Beater modeon the front touch pad by pressing the Push to Selectbutton (#571.2) unti
3ForewordThank you for selecting Coldelite to meet your operation and growing demands.Your Coldelite freezer has been manufactured utilizing the most
30Remove the feeding elbow assembly from the mixtank by first sliding the connecting tube away fromthe pump cover, Then turn the elbow assemblyslightl
31You are now ready to disassemble and clean yourfreezer. Please refer to Part III – Initial Cleaning Pro-cedure of this operation manual for instruct
32Part X – MaintenanceYour Coldelite freezer has been designed,engineered, and manufactured to achieve high per-formance and long durability. The life
A) Trouble Shooting Guide – Gravity Fed FreezersProblem Possible Cause Suggested Solution1) Product too soft a) Drawing faster than the machine can p
A.1) Trouble Shooting Guide – Pump Fed FreezersProblem Possible Cause Suggested Solution1) Product too soft a) Drawing faster than the machine can pr
B) Machine Safety AlarmsThis freezer is equipped with built in, self monitoring (Safety) devices, which will interrupt operation of the freezer if act
4
5Foreword Page #Part I InstallationA) Uncrating 7B) Positioning the Machine 7-8C) Electrical Requirements 8D) Completing the InstallationPart II Expla
7!! IMPORTANT !!Failure to closely follow operational and maintenanceprocedures may result in damage to the unit and / orvoid your warranty. Coldelite
8Note: If these clearances are not maintained, theproduction capacity will be reduced, cycling will beincreased and the potential will exist that the
9L1L2L3L5L4570571.1571.2Part II – Explanation of ControlsA) Electronic Touch Pad – (Refer to figure 4)Figure 4This machine is equipped with one elect